23/11/09

< back

23rd November 2009

 

The eccentric strap for the inside valve gear is set on the vertical borer. Once this is accurately aligned, the new white metal bearing surface can be machined.

 

In the photo the bulk of the material is being 'roughed out' ready for machining to finished size.


Share by: